Cars > BigNuttyPaul’s Garage > “GTA” > Albums > Winter 10 to 11 Projects
Photos in the “Winter 10 to 11 Projects” Album
-
- Description: The winter projects for 2010 to 2011. I installed a 2002 Trans Am console a four point harness new led lighting in the interior and modded the trim in the insterment cluster. That was just the interior and about 65 hours worth work. Under the hood I removed the front pulley drive and cleaned and painted everything. I also replaced the water pump with a high flow cast unit and the two idler pulleys. The engine bay got cleaned and painted where it needed. After that was done (should have been before) I installed headers. I have about 120 hours under the hood this winter not including retuning it.
- By: BigNuttyPaul
- Filed under: 1989 Pontiac Trans Am GTA (GTA)
- Number of photos: 40
- Updated: Thu Jun 2, 2011 1:24 pm
Page 1 of 2: 1 2 > Last >> Photos 1 – 21 of 40
-
- brackets off getting it ripped down
- comment
-
- what it looked like under the brackets after 22 years
- comment
-
- Cleaned the steering box
- comment
-
- cleaning the block
- comment
-
- touched up the motor mounts
- comment
-
- freash coat of paint on the block and steering box
- 1 comment
-
- blasted the brackets before painting them
- comment
-
- sand blasted the brackets before painting them
- comment
-
- drying the paint after painting in my barn
- 1 comment
-
- drying the paint after painting in my barn
- comment
-
- the new water pump painted
- comment
-
- water pump ready to install
- comment
-
- tensioner ready to install
- comment
-
- alternator ready for install
- 1 comment
-
- water pump on
- 1 comment
-
- the brackets back on
- comment
-
- the brackets back on
- comment
-
- the brackets back on
- comment
-
- engine back together
- 2 comments
-
- engine back together
- 1 comment
-
- the brackets back on
- comment
Cars > BigNuttyPaul’s Garage > “GTA” > Albums > Winter 10 to 11 Projects


